Interconnecting Intelligence The facts on AI, from demand to buildout.

EnergyData release

Oncor reports about 24 GW of large load classified as base load in ERCOT's Batch Zero process

The classification is conditional and includes 10 GW of already energized load. Oncor also reports 21 GW classified as studied load within its footprint.

Size
24 GW
Place
Texas
Companies
ERCOT, Oncor
Source
Sempra 8-K, filed Nov 5, 2026
Published here

Download share image

This fact was extracted from the source above and checked automatically: every number and company named here appears in it. When the same fact turns up in another filing or post, that source is added here instead of a second copy. Read the original before relying on it.