Cipher Digital begins developing lateral gas pipelines to support up to 2.5 GW of on-site generation
2.5 GW
It targets gas availability in 2027, with potential for power generation soon after. Cipher also received ERCOT Batch Zero classifications for Texas pipeline sites, including a base load conditional classification for Colchis (1 GW), with final classifications expected in December.
Cipher DigitalERCOT Source: Cipher Digital Inc. 8-K, filed Nov 2, 2026