EnergyAnnouncement
Oncor reports about 24 GW of large load classified as base load in ERCOT's Batch Zero process
The classification includes 10 GW of already energized load, and 21 GW is classified as studied load. The projects show customer commitment through financial security, site control and other ERCOT qualification requirements.
- Size
- 24 GW
- Place
- Texas
- Source
- Sempra 8-K, filed Nov 5, 2026
- Published here
This fact was extracted from the source above and checked automatically: every number and company named here appears in it. Read the original before relying on it.