EnergyAnnouncement
Cipher Digital begins developing lateral gas pipelines to support up to 2.5 GW of on-site generation
It targets gas availability in 2027, with potential for power generation soon after. Cipher also received ERCOT Batch Zero classifications for Texas pipeline sites, including a base load conditional classification for Colchis (1 GW), with final classifications expected in December.
- Size
- 2.5 GW
- Place
- Texas
- Companies
- Cipher Digital, ERCOT
- Source
- Cipher Digital Inc. 8-K, filed Nov 2, 2026
- Published here
This fact was extracted from the source above and checked automatically: every number and company named here appears in it. Read the original before relying on it.