ComputeAnnouncement
BitSink holds $15 million of signed purchase orders for NEXUS 3.0 modular AI infrastructure blocks
Each block delivers 3.0 MW of total power and supports 2.5 MW of critical IT load for NVIDIA GB300 and Cerebras CS-3 systems. Blocks will be built in a new 65,000-square-foot Chesnee, South Carolina facility, with delivery over the next year.
- Size
- $15 mn
- Place
- Chesnee, South Carolina
- Source
- AirJoule Technologies Corp. 8-K, filed Nov 16, 2026
- Published here
This fact was extracted from the source above and checked automatically: every number and company named here appears in it. When the same fact turns up in another filing or post, that source is added here instead of a second copy. Read the original before relying on it.