Interconnecting Intelligence The facts on AI, from demand to buildout.

EnergyAnnouncement

Hut 8 raises Energy Capacity Under Construction to 1,330 MW across River Bend and Beacon Point

The total comprises 330 MW at River Bend and 1,000 MW at Beacon Point after 500 MW at Beacon Point advanced following the Phase 2 lease. Initial data hall delivery is targeted for Q2 2027 at River Bend, Q3 2027 at Beacon Point Phase 1, and Q2 2028 at Beacon Point Phase 2.

Size
1,330 MW
Companies
Hut 8
Source
Hut 8 Corp. 8-K, filed Nov 4, 2026
Published here

Download share image

This fact was extracted from the source above and checked automatically: every number and company named here appears in it. Read the original before relying on it.