APS's 2026 IRP projects retail energy demand rising by about 42,000 GWh by 2041, driven by manufacturing and data centers
The Preferred Portfolio identifies about 15 GW of new resources and about 2.6 GW of transmission capacity needed. Manufacturing and data centers are expected to drive the majority of incremental load growth.
- Size
- 42,000 GWh
- Place
- Arizona
- Companies
- APS
- Source
- Pinnacle West Capital Corp 8-K, filed Nov 6, 2026
- Published here
This fact was extracted from the source above and checked automatically: every number and company named here appears in it. When the same fact turns up in another filing or post, that source is added here instead of a second copy. Read the original before relying on it.