Interconnecting Intelligence The facts on AI, from demand to buildout.

EnergyAnnouncement

ERock expands manufacturing capacity by 900 MW/year with new Atlas facility in Houston

The Atlas facility brings run-rate capacity to 2.1 gigawatts (GW) per year in 2028. ERock also signed an engine long block contract with HD Construction, enabling expanded volumes for customers in 2028.

Size
900 MW
Place
Texas, Houston
Companies
ERock, HD Construction
Source
ERock, Inc. 8-K, filed Nov 12, 2026
Published here

Download share image

This fact was extracted from the source above and checked automatically: every number and company named here appears in it. Read the original before relying on it.