EnergyFiling
APS 2026 IRP projects retail energy demand up about 42,000 GWh by 2041
The 2026 IRP says manufacturing and data centers are expected to drive the majority of incremental load growth. The Preferred Portfolio identifies about 15 GW of new resources and about 2.6 GW of transmission capacity needed.
- Size
- 42,000 GWh
- Place
- Arizona
- Companies
- APS
- Source
- Pinnacle West Capital Corp 8-K, filed Nov 6, 2026
- Published here
This fact was extracted from the source above and checked automatically: every number and company named here appears in it. Read the original before relying on it.