EnergyDeal
BKV Power JV signs cost reimbursement agreement with a Leading Frontier AI Lab to raise Temple modular power to 400 MW
The CRA supports an increase in planned modular generation at the Temple Energy Complex to 400 MW from 200 MW. If offtake arrangements are not agreed by November 18, 2026, the CRA covers up to approximately $179 million, with an aggregate cap of $374.1 million on reimbursement if the offtaker takes assignment of the equipment contract.
- Size
- 400 MW
- Place
- Temple, TX
- Companies
- BKV, BKV-BPP Power
- Source
- BKV Corp 8-K, filed Nov 5, 2026
- Published here
This fact was extracted from the source above and checked automatically: every number and company named here appears in it. Read the original before relying on it.